MIL-DTL-23618H(AS)
b. List of effective cards ("A" card) (see 3.3.3).
c. List of TPDRs incorporated card (TPDR card) (see 3.3.4).
d. Warnings applicable to hazardous materials card (HMWS card) (see 3.3.4.1).
e. Introduction and application statements card (see 3.3.7.5).
f. Definitions card (see 3.3.9).
g. Abbreviation and index cards (see 3.3.14).
h. Special tools/SE list cards (see 3.3.16).
i. Consumable maintenance material list cards (see 3.3.17).
j. Replacement parts list cards (see 3.3.18).
k. Work area cards (see 3.3.19).
l. Access panel cards (see 3.3.22).
m. Task cards (see 3.3.26).
(1) Calendar or
(2) Start
n. Illustration cards (see 3.3.27).
o. QA cards (see 3.3.31).
3.2.5 Powered aerial target (PAT) PMRMs.
3.2.5.1 Acceptance/initial buildup manual (PAT). This manual contains the acceptance
inspections, buildup procedures, and testing and servicing requirements for newly issued targets.
The cards in this manual are arranged in groups according to the rating or MOS required to
perform the tasks.
3.2.5.1.1 Arrangement. The arrangement of the acceptance/initial buildup manual and the
format of each card within it shall be as follows:
33
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business