MIL-PRF-85337B(AS)
(20) Local engineering specifications.
(21) Manual change releases (MCRs).
(22) Technical manual source data records (TMSDRs).
(23) Technical publication deficiency reports (TPDRs).
(24) Technical manual evaluation reports (TMERs).
(25) Validation/verification comments.
(26) Design change notices (DCNs).
(27) Supply item change records (SICRs).
(28) Technical Manual Contract Requirement.
(29) Technical Manual Content and Product Plan.
b. Database control documents:
(1) Data recording and cataloging system developed.
(2) Management forms developed.
(3) Liaison with data release authority established.
(4) Procedure for ECP routing for TM input.
(5) Release schedule tracking documented.
(6) Liaison with design and training groups established and documented.
(7) Procedures for engineering review of draft material and sign-off developed.
3.2.3.1.3 Technical manual content and product plan or equivalent. The TM content and
organization shall be consistent with a TMCPP or task identification matrix, prepared in
accordance with the guidelines provided by NAVAIR 00-25-604 or NAVAIR 00-25-700. The
TMCPP or task identification matrix shall ensure that all required levels of maintenance are
sufficiently detailed and complete. The TMCPP is considered to be sufficiently detailed upon
agreement between the Government and the contractor. The TMCPP or task identification
matrix shall be in agreement with the logistic support analysis (LSA) task analysis data,
approved maintenance plan, and approved source, maintenance, and recoverability (SM&R)
codes.
3.2.3.1.4 Control of subcontractors and vendors. The contractor shall ensure the quality of
TMs prepared by subcontractors and suppliers.
7
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business