MIL-DTL-23618H(AS)
m. Zonal inspection criteria card (not required in daily manual) (see 3.3.21).
n. Access panel cards (see 3.3.22).
o. Antenna location cards (not required in daily manual) (see 3.3.23).
p. Task cards as applicable (see 3.3.26).
(1) Daily
(2) Special (day)
(3) Special (hour)
(4) Special (event)
(5) Preservation
(6) Depreservation
(7) Conditional (as required)
(8) ASPA cards (see 3.2.1.3e).
q. Illustration cards (see 3.3.27).
r. QA cards (see 3.3.31).
3.2.1.4 Phased maintenance requirements manual (aircraft). The phase requirements are
formulated by dividing the total applicable scheduled inspection requirements into phases which
are performed at specified intervals and have approximately the same work content and EMT.
This includes all QEC, propeller and engine requirements which are performed on the installed
QECA. The number of phases is established after the scope of the total workload has been
identified by maintenance engineering analysis. Through application of this concept, a portion of
the total recurring inspection requirements is accomplished at each phase and the cycle will be
repeated after completion of the last phase.
3.2.1.4.1 Flight-hour inspections. If a majority of the scheduled maintenance requirements
specified for a phase inspection cycle are flight-hour sensitive, the requirements shall divided into
phases based on flight hours.
3.2.1.4.2 Phase or calendar inspections. If a majority of the scheduled maintenance
23
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business