MIL-DTL-81218C(AS)
e. Publication number, date and supersedure notice, when applicable.
3.7.1.3 Middle portion. Blocks in the middle portion of the SCC shall be arranged to
identify specific tasks in the logical sequence of accomplishment. The block width shall be lined
up with the time brackets in the lower portion. The task title and number shall be the same as the
intermediate maintenance manual. The WP number shall be placed in the upper right hand
corner of each block. The work area number(s) shall be located in the lower right hand corner.
WPs which contain major engine inspection requirements shall be identified by placing an asterisk
before the WP number. Task assignments to specific crew members shall be shown at the left.
Identification of the major engine inspection asterisk shall be shown.
3.7.1.4 Lower portion. A graph coordinate for TIME shall be divided into equal vertical
increments of one hour, and each hourly increment shall be subdivided in six equal parts rated at
ten minutes each. The graph shall display the total clock hours required to process the engine and
individual tasks. In addition, the time allowed each crew member to accomplish specific tasks will
permit a computation of manhours per task. If task time is excessive and could cause the length
of the SCC to exceed 52 inches, a reduction of areas used to reflect time shall be made by
grouping large individual time lapses of more than two hours into smaller increments. The tasks
shall be listed by WP number in parentheses with the left parenthesis located at the time the task
will begin and the right parenthesis at the time the task will be completed. Blocks for engine
identification number and supervisor and crew member number shall be included at the left of the
lower portion. The lower portion shall include provisions that will permit tracking and recording
of four engines.
3.7.2 Type size. Type size shall be at least 8-point type.
3.7.3 Paper stock. The SCC shall be printed on white 50 pound paper.
3.7.4 Folded dimension. The SCC shall be folded accordion style to approximately 7 1/2 x
12 inches, and so folded that the publication number will be visible.
4. VERIFICATION
4.1 Verification. Verification shall be conducted as prescribed in the contract.
5. PACKAGING
5.1 Packaging. For acquisition purposes, the packaging requirements shall be as specified in
the contract or order (see 6.2). When actual packaging of material is to be performed by DoD
personnel, these personnel need to contact the responsible packaging activity to ascertain requisite
packaging requirements. Packaging requirements are maintained by the Inventory Control Point's
packaging activity within the Military Department or Defense Agency, or within the Military
17