MIL-DTL-81310G(AS)
d. Standard aircraft system checks (other than armament) completed.
e. Aircraft/armament safety precautions complied with.
f. Weapons/stores positioned and secured on approved handling equipment.
g. After loading/unloading, handling and/or safety equipment will be removed from the
area.
h. Safety and reliability are of primary importance and will be stressed in all applicable
portions of the checklists.
3.6.1.1 Weapons/stores loading checklist content (as applicable) <weapons-checklist>.
a. Front matter <front-weapons-checklist>.
b. Aircraft preparation/inspection <aircraft-prep-inspect-check>.
c. Weapons/stores inspection <weapons-inspect-check>.
d. Weapons/stores loading <weapons-loading-check>.
e. Postloading inspections <postloading-insp-check>.
f. Prior to launch <prior-to-launch-check>.
g. After launch <after-launch-check>.
h. After landing or ground abort <after-landing-ground-abort-check>.
i. Weapons/stores unloading <weapons-unloading-check>.
j. Turnaround <turnaround-check>.
k. Additional procedures <additional-proc-check>.
3.6.1.2 Release and control system checklist content (as applicable) <release-ctrl-sys-
checklist>.
a. Front matter <front-load-release-checklist>.
b. Aircraft preparation <aircraft-prep-inspect-check>.
c. Release and control system checks <release-ctrl-sys-check>.
8
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business