MIL-PRF-63012B
3.6 Chapter 3, quality acceptance requirements. This chapter shall identify acceptance requirements
including ballistic test requirements (BTR), product defect criteria, acceptable quality levels (AQL), or site
defect criteria identified in the operational steps to include defect classification or to incorporate appropriate
statistical process control (SPC) statements for performing activities.
3.7
Definitions. All quality assurance terms used in the DMWR shall be listed and defined.
3.8 Appendixes. Appendixes shall be added to a DMWR as applicable for purposes of illustration,
application, and general information. Appendix identification shall be alphabetical throughout the document
in the order of reference in the text (i.e., APPENDIX A, APPENDIX B, etc). Each appendix shall begin on
a right-hand page. Appendix pages shall be consecutively numbered (i.e., A-1, A-2, etc). Appendixes shall
immediately follow the last figure of the DMWR.
3.8.1 Appendixes. The following appendixes shall be Included as applicable:
3.8.1.1 Appendix A. References. This appendix shall consist of all publications referenced in the
DMWR (except military specifications and drawings which are listed in Appendix D). The publications
shall be listed in groups by publication type. If nongovernment, the source shall be provided. The complete
name and number of each publication shall be used. See figure 6 for an example.
3.8.1.2 Appendix B. Consumable materials. This appendix shall consist of a list in tabular format and
shall contain as a minimum this data: item number, NSN, federal item name and description if needed, part
number, CAGEC, and unit of issue. See figure 7 for an example.
3.8.1.3 Appendix C. Equipment and special facilities. Appendix C shall consist of a list of equipment
and special facilities required to perform the operations described in the DMWR. See figure 8 for an
example.
3.8.1.4 Appendix D. Tabulated data, military specifications, and drawings. Appendix D shall consist of
a list of tabulated data extracted from Army Data Sheets, and/or major specifications and drawings
applicable to the DMWR operations. See figure 9 for an example.
3.8.1.5 Appendix E. Approved intraplant transfer equipment. This appendix lists suggested or
commonly available equipment. If the DMWR operations require no intraplant APE, this appendix should
be omitted. See figure 10 for an example.
3.8.1.6 Appendix F. Pentachlorophenol (PENTA)-treated packing materials. When specified by the
contracting activity (see 6.2), this appendix shall be used to include the latest requirements in all DMWRs.
See figure 11 for an example.
3.8.1.7 Appendix G. Environmental requirements. This appendix shall be used to include the latest
requirements. As a minimum, this appendix shall include air, noise, and emission problems and controls as
applicable.
3.8.1.8 Appendix H. Hazard analysis or briefing. This appendix shall contain a hazard analysis updated
7
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business