MIL-DTL-24784/17B(SH)
a. Summary of all utilities required by the system, such as air, water, power, steam, freon, and so
forth.
b. System interconnection diagrams.
c. Cable run diagrams (see MIL-DTL-24784).
d. System piping diagrams (see MIL-DTL-24784).
e. System cable interconnection check.
f. Active system tests.
g. System component installation procedures.
3.6.10.1 Utilities list. A utilities list shall be included that presents in tabular form all utilities
required, and the quantities of each, in each system, compartment, and area.
3.6.10.2 System interconnection diagrams. System interconnection block diagrams shall be
prepared and presented with each equipment or component shown as a block (see figure 17-7).
All cables running between equipments shall be identified by cable number. The number of active
and spare leads in each cable shall be included. The illustrations shall also indicate all junction
boxes, switchboards, and so forth, into which interconnection cables enter or leave.
3.6.10.3 System cable interconnection check. Cold-wire check procedures shall be provided to
verify the proper installation of all system cables. These checks shall be prepared to be conducted
with all power off and all equipment completely shut down.
3.6.10.4 Active system tests. All active system test procedures required to verify the proper
installation and operation of the system shall be included. Reference may be made to applicable
tests and procedures in Chapter 6. Procedures for complete setup, testing, shut down, and data
analysis shall also be provided.
3.6.10.5 System component installation procedures. Complete step-by-step instructions shall be
provided for installation of system components not covered in any of the equipment manuals for
the equipment comprising the system. The following types of supplemental information not
provided in the equipment technical manual shall be included:
a.
Instructions required to assemble components.
b.
Instructions required to mount components. Include boring and bracing diagrams and data
on shock mounts.
c.
Instructions for making electrical, waveguide, plumbing, and all other interface connections
between equipments, components, and other systems.
d.
Servicing procedures, such as initial lubrication and adjustments.
e.
Instructions for bonding and grounding.
3.6.10.5.1 Installation drawings. The following drawings shall be included:
a.
Pictorial diagrams.
b.
Outline and mounting dimension data.
14