MIL-DTL-24784/18B (SH)
c.
Outline and installation drawing.
d.
Auxiliary cooling diagram.
e.
Auxiliary dry gas diagram.
f.
Cable running sheets.
g.
Summary list of installation material.
h.
RF transmission line diagram.
i.
Hydraulic fluid piping diagram.
3.6.9.2 Site or installation location information. Data shall contain information supplemental to
the installation drawings. If all site information is contained on the installation drawings,
reference shall be made to the applicable drawings by figure number.
3.6.9.3 Reference publications. When specified in the TMCR (see 6.2), reference shall be made
to military-issue general publications required to complete the installation, when it is impractical
to include such information.
3.6.9.4 Tools and materials required for installation. Include information supplemental to the
summary list of installation material. If no supplemental information is required, reference the
drawing by figure number.
3.6.9.5 Unpacking and repacking. Include information supplemental to the installation drawings
regarding unpacking and repacking. Include step-by-step procedures to prevent damage to the
equipment or injury to personnel. Supporting illustrations shall be provided to clarify procedures.
When packing for reshipment is required, step-by-step procedures for packing shall be included
and illustrated. When packing is simply the reverse of unpacking, this fact need only be stated.
Any special environmental conditions required for storage shall be provided. Instructions shall be
included for items in the following categories.
a.
Depreservation procedures required at time of installation.
b.
Represervation packaging required prior to repacking for storage or shipment.
c.
Intricate mounting, blocking, or bracing.
d.
Special cushion inserts.
e.
Repairable items.
f.
Sensitive or fragile components.
g.
Items held in special cradles.
h.
Items furnished in reusable containers.
i.
Special environmental conditions required for storage.
j.
Special handling procedures required.
k.
Container storage or disposition instructions, as applicable.
The instructions shall be detailed to prevent handling damage to the equipment or injury to
personnel. In addition, step-by-step procedural illustrations may be used to supplement the
packing and handling instructions.
3.6.9.6 Preparation of foundations. Include information supplemental to the installation