MIL-DTL-87929D
APPENDIX C
SPECIAL REQUIREMENTS FOR AIRCRAFT POWER PACKAGE
(ENGINE INSTALLATION HARDWARE CONFIGURATION) TESTING
PROCEDURES TECHNICAL MANUAL
C.1 SCOPE.
C.1.1 Scope. This appendix provides the special or unique criteria, in addition to the provisions of this
speciication, required for development of a technical manual (TM) for Aircraft Power Package Testing
Procedures (Engine Installation Hardware Coniguration). The markup tags described herein are based on
rules outlined in MIL-HNDBK-28001 and ISO 8879. The information contained in and referred to in this
appendix forms a part of the standard and is intended for compliance. The Document Type Deinition (DTD)
referenced herein may be obtained directly from the preparing activity (see A.4.3). This technical manual
requirement shall apply when test facilities have been provisioned and the using command maintenance plans
require test and trim of removed power packages.
C.2 APPLICABLE DOCUMENTS.
Not applicable.
C.3 SPECIAL REQUIREMENTS.
C.3.1 Testing procedures manual. This manual shall include testing procedures for aircraft power package
in engine installation hardware coniguration with the power package removed from the aircraft. All essential
information required to install the power package in the test stand, conduct tests, adjust engine trim,
analyze any malfunctions evidenced during test, and remove the power package from the test stand shall
be included. Instructions shall include a functional test of all power package components remotely
controlled by or having indicators in the cockpit.
C.3.1.1 Testing facility WP. A brief description of the entire test facility and functional descriptions of the
controls and indicators used and monitored during power package testing shall be included. Illustrations shall
be provided to portray control panels and indicators peculiar to testing of speciic power packages. Calibration
requirements for peculiar test instrumentation shall include the frequency of calibration and required accuracy
of instruments only. Reference to applicable instrument manuals for calibration instructions shall be made.
C.3.1.2 Preoperative procedures WP. Detailed step-by-step instructions for all preliminary operations required
prior to performing a power package test run shall be included. Instructions shall include:
a. Initial preparation of test area.
b. Engine transfer from transportation dolly to run-up dolly.
c. Installation and positioning of equipment and special tools required for test.
d. Engine inspection.
e. Installation of run-up dolly in test facility.
f. Servicing instructions.
g. Hook up of all control and instrumentation connections (at engine and test facility) and
preliminary leak check.
h. Final preparation of test area.
i. Positioning of power switches and circuit breakers.
j. Engine anti-icing valves check (check both engine anti-icing valves and nose cowl anti-icing valves).
k. Ignition system check.
l. Constant Speed Drive (CSD) oil system priming (if applicable).
m. Oil sampling (if applicable).
36
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business