MIL-DTL-24784/7C(NAVY)
a.
Examples of support equipment are: test fixtures and special electronic test equipment; mounting, holding,
and support jigs; special tools and gauges; special mechanical and electrical interface or interconnection
(mating) adapters, cables, and connectors, and so forth.
b.
If there are no requirements for special test support equipment data, the TRS shall so specify.
3.8.7.3 Appendix C - test data record sheets. This appendix shall contain the TRS test data record sheets for the
repairable items covered by the TRS.
3.8.7.4 Additional appendices (D and on). Other appendices shall be developed for the specific repairable
items type covered by the TRS as required (see 6.2).
3.9 Ordnance TRS technical content. The sequence of ordnance TRS technical data shall conform to the
following:
a.
Front matter (see Appendix A of MIL-DTL-24784).
b.
Chapter 1 - General requirements information (see 3.9.1).
c.
Chapter 2 - Examination, tests, and corrective actions (see 3.9.2).
d.
Chapter 3 - Planned overhaul and repair maintenance (see 3.9.3).
e.
Chapter 4 - Reassembly and grooming (see 3.9.4).
f.
Chapter 5 - FAT (see 3.9.5).
g.
Chapter 6 - Facilities, equipment, and personnel requirements (see 3.9.6).
h.
Chapter 7 - Preservation, packaging, handling, storage, and transportation requirements (see 3.9.7).
i.
Chapter 8 - Overhaul and repair record requirements (see 3.9.8).
j.
Appendix A - Contingency material list (see 3.9.9b).
k.
Appendix B - Planned overhaul and repair material list (see 3.9.9a).
l.
Appendix C - Traveler and inspection, discrepancy, and repair report (see 3.9.8.2).
m. Enclosures (see 3.9.10).
3.9.1 Chapter 1 - general requirements information. This chapter delineates repairable end-product
requirements, procedures for obtaining changes or waivers, and workflow diagrams or charts. The chapter shall
3.9.1.1 Frontispiece illustration. The front matter shall include a pictorial representation of the repairable items
covered in the TRS and shall be placed on the left-hand page preceding Chapter 1 (see MIL-DTL-24784).
3.9.1.2 Content. Chapter 1 shall include statements that:
a.
The overhauling or repairing activity is responsible for overhauling or repairing the system, equipment, or
component so that it satisfies the post-overhaul or repair requirements specified in Chapter 5 FAT.
b.
When there is conflict between the TRS and original design, the requirements in the TRS and associated
quality assurance test and inspection plans (QATIPs) shall take precedence. Prior to the inclusion of
procedures in the TRS and QATIPs that are in conflict with original design criteria, approval shall be
obtained from the LCM.
c.
Component configuration changes shall not be made when such changes prohibit use of approved parts for
the item involved unless required engineering changes, waivers, or deviations have been obtained in
accordance with provisions of MIL-HDBK-61. This action shall be detailed in order to maintain authorized
configurations.
d.
Production process flow charts or work flow block diagrams (see MIL-DTL-24784) graphically depicting
the sequence of repair or overhaul events required to occur throughout the maintenance process described
in the TRS. These displays may consist of an overall block diagram depicting the entire process with more
detailed flow charts for specific phases or repair or overhaul activity. Sufficient detail should be provided
to clearly illustrate the described process.