MIL-DTL-5288J
f. Extraction parachutes release mechanism.
g. Inspection/rigging of extraction parachutes and sling extraction line bag.
3.2.9 Alphabetical index. An alphabetical index shall be included and prepared in accordance with
the requirements of MIL-STD-38784.
3.3 Nuclear Weapon Cargo Loading manual. The Nuclear Weapon Cargo Loading manual shall be arranged
as follows. Appendix B provides the DTD for the electronic delivery of this manual.
a. Front matter (see 3.2.1).
b. Chapter 1 Introduction.
c. Chapter 2 Loading, Off-loading, and General Procedures.
d. Chapter 3 Bombs Speciic Procedures.
e. Chapter 4 Warheads Speciic Procedures.
f. Chapter 5 Missiles and Other Nuclear Weapon Cargo Speciic Procedures.
g. Chapter 6 Emergency Procedures.
h. Chapter 7 Logistic Movement Procedures.
i. Alphabetical index (see 3.2.9).
3.3.1 Chapter 1 Introduction. Chapter 1 shall be prepared in accordance with the requirements of 3.2.2,
except that the following information shall also be included:
a. Nuclear safety certiication statement.
b. Two-person concept.
c. Designation of bombs, warheads, basic assemblies, and carriers.
3.3.1.1 Nuclear safety certiication statement. The following statement shall be included as a standard
paragraph:
"The support equipment and procedures contained herein have been evaluated and are acceptable for
this prescribed routine use with nuclear weapons."
3.3.1.2 Two-person concept. Unless otherwise speciied by the acquiring activity (see 6.2), the deinition
of the two-person concept as given in AFI 91-104 (Air Force) and AIRLANT/AIRPAC Instructions
(Navy) shall be included in this paragraph.
3.3.2 Chapter 2 Loading, off-loading, and general procedures. Unless otherwise speciied by the acquiring
activity (see 6.2), this chapter shall contain loading and off-loading procedures common to all nuclear
weapon cargo, using various methods and equipment. This chapter shall have the following arrangement with
appropriate warnings, cautions, and notes to assure safety of operation.
a. General.
b. General precautions and practices.
c. Restrictions on tiedown (see 3.2.5.2.6).
d. Shoring (see 3.2.5.5.4).
e. Loading aids (see 3.2.3.3).
f. Winch preparation (see 3.2.5.3.3).
g. Loading/off-loading and jettisoning (see 3.2.5.2).
3.3.2.1 General. This paragraph shall discuss the general content and purpose of this chapter and shall
contain a reference to the appropriate loading instructions manual (see 3.2) and checklist (see 3.4)
to be used in conjunction with these procedures.
3.3.2.2 General precautions and practices. Information relative to proper inspections and general precautions
to be followed when loading nuclear weapon cargo shall be included.
12
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business