MIL-DTL-5288J
3.3.3 Chapter 3 Bombs speciic procedures. In addition to the information in 3.2.7 this chapter shall
include a general paragraph containing a brief description of each bomb to be loaded and off-loaded.
3.3.4 Chapter 4 Warheads speciic procedures. In addition to the information in 3.2.7 this chapter shall
include a general paragraph containing a brief description of each warhead to be loaded and off-loaded.
3.3.5 Chapter 5 Missiles and other nuclear weapon cargo speciic procedures. In addition to the
information in 3.2.7 this chapter shall include a general paragraph containing a brief description of each
missile or nuclear weapon to be loaded or off-loaded.
3.3.6 Chapter 6 Emergency procedures. Unless otherwise speciied by the acquiring activity (see 6.2), this
chapter shall contain policies and procedures for communication, ireighting, general accidents, emergency
destruction, unscheduled landings, accident/incident follow-up procedures, and applicable information contained
in 3.3.6. These procedures shall be covered by reference to other manuals or detailed instructions.
3.3.7 Chapter 7 Logistic movement procedures. This chapter shall cover emergency logistic movement
of nuclear weapon cargo for maximum tested and maximum density aircraft loads. Arrangement shall
be similar to chapters 2, 3, 4, and 5 except routine loading and off-loading procedures in chapter 2
shall not be repeated in this chapter.
3.4 Checklists. Unless otherwise speciied by the acquiring activity (see 6.2), loadmaster checklists and
nuclear weapon cargo checklists shall be prepared to cover each phase of the speciied procedures. The
format shall be as shown in igure 13 and shall conform to the requirements of MIL-PRF-5096 (Air
Force) and the general requirements of MIL-C-81222 (Navy). The checklists shall include, but not
limited to the categories shown below. Appendix C provides the information for obtaining the DTDs
for electronic delivery of the manual.
a. Title page/screen.
b. List of effective pages (print presentation only)
c. List of changes (electronic presentation only)
d. Foreword.
e. Table of contents.
f. Load planning.
g. General winching preparation.
h. General winching.
i. Palletized cargo loading.
j. Vehicle inspection.
k. Vehicle loading.
l. Cargo off-loading.
m. Personnel loading.
n. Personnel off-loading.
VERIFICATION
4
4.1 Veriication Requirements. When the technical data produced according to this speciication is
offered for acceptance, all tests, reviews, and veriications required by the acquiring activity to determine
that it conforms to the requirements in section 3 of the speciication, shall be performed as speciied
in the solicitation or contract. The Air Force Technical Order Policy and Procedures (AF TOPP) team,
AFMC/A4UE, provides the speciic requirements for veriication of technical data developed and delivered
through this speciication, as well as guidance for including these requirements in the solicitation or contract
(see TO 00-5-3, AF Technical Order Life Cycle Management, 2.2.2).
4.2 Compliance. TMs shall meet all requirements of section 3 of this speciication and the appropriate
DTD appendix, as required by the acquiring activity (see 6.2). The requirements set forth in this
13
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business