MIL-DTL-81919C(AS)
c. Local manufacturing and assembly instructions.
(1) Fabrication procedures for items source coded as "Make From" or "Assemble From"
at the organizational or intermediate maintenance level shall be provided.
(2) Simple procedures, adequately depicted in the IPB, shall not be covered.
d. Periodic (scheduled) maintenance. Periodic maintenance not including operator's
maintenance. Operator's maintenance is included in "Operating Instructions."
3.3.5.2 Common coverage requirements.
a. Calibration procedures. Calibration procedures shall not be included under "Maintenance"
and shall be provided in separate calibration procedures or manuals.
b. SE and material required identification. "Support Equipment Required" and "Material
Required" lists shall be prepared in accordance with MIL-DTL-81927. Only approved,
for the maintenance level(s) covered, SE required shall be listed or used in the procedures.
c. Step-by-step procedures. Step-by-step procedures, supported with appropriate
illustrations, shall be referenced or provided for all maintenance procedures.
d. References. See MIL-DTL-81927.
e. Maintenance analysis. Procedures shall include an assessment of the reported/actual
problem and the action required to accomplish repair.
f. Repairable assemblies. Normally a repairable assembly would require complete coverage
in a separate WP. However, when testing and troubleshooting are not required, a simple
assembly or subassembly can be properly covered under the coverage of the next higher
assembly. When the task analysis determined that the testing and troubleshooting is
required to be accomplished using the next higher assembly, the complete coverage may
be contained in a separate WP or in the WP for the next higher assembly. When complete
separate coverage is co-located with the next higher assembly, procedures shall stand
alone. The technical manual outline shall reflect the intended coverage.
g. Special procedures. Specific instructions for any precautions, or special maintenance
required for items susceptible to electrostatic discharge or hardness critical processes shall
be included.
h. Special processes. Information shall be included for any special process required under
extreme environmental or operational conditions within the design limits of the equipment.
18
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business