MIL-DTL-81919C(AS)
j. Artwork requirements.
k. Changes/revisions.
3.1.5 IPB.
3.1.5.1 Relationship between the IPB and the WP concept. The IPB is an integral part of the
technical data to be prepared in support of maintenance tasks. Therefore, it is essential that the
intent of the WP concept is followed in the development of the supporting IPB. Emphasis shall
be placed on the accessibility of data, comprehensibility of supporting illustrations, and the use of
the information presented. The IPB data shall be prepared in accordance with MIL-DTL-15014
or MIL-DTL-81929, as applicable. The IPB figure(s) shall be an integral part of the maintenance
element.
3.1.5.2 IPB figures. The format of IPB figures shall be compatible with all reproduction
media. This shall be accomplished through control of legibility of the Group Assembly Parts List
(GAPL), proper line art techniques in the preparation of supporting illustrations, and coordinated
GAPL entries with illustrations (see MIL-DTL-81927 and NAVAIR 00-25-700).
3.1.6 Common requirements. Documentation prepared in accordance with this specification
shall contain instructions for organizational, intermediate, and/or depot level maintenance.
Mandatory compliance standard shop practices and techniques given in general maintenance
engineering series manuals shall not be duplicated. Appropriate references shall be made to other
manuals when required. Prepared documentation shall follow the approved maintenance plan and
level of repair analysis for the end item covered. Only authorized SE, at the appropriate level of
maintenance, shall be included in the maintenance instructions. Sound engineering principles,
performance data, and available reliability data shall be used in the preparation of maintenance
procedures.
3.1.6.1 Development and presentation. All technical data prepared in WP format shall be
specifically designed to respond to functional work tasks.
3.1.6.1.1 Technical manual organization and functional elements. WP technical manual
organization shall be by system or equipment and arranged by functional element in logical task
order sequence. Functional elements and related data shall include but are not limited to:
a. Description and principles of operation, including controls and indicators.
b. Preparation for use, including initial installation if not performed by a support activity.
c. Operation Instructions (end item), if required.
5
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business