MIL-M-81273/1A(WP)
In addition, the record must be ap-
responsibility; therefore, check-off
propriately modified during overhaul
sheets are summaries of completed
procedures wherein entries on the
tasks with provision for initialing by
record are subject to change. The
the user at each task. Check-off
record shall always accompany as-
sheets are worded in the past tense
to preclude appearing as instruc-
sembly and test procedures. All
entries on the record shall be called
tions - the sheets are not instruction-
for in the accompanying procedures.
al and do not contain all procedures.
It is the responsibility of the cogni-
Check-off sheets are normally pre-
zant writer to determine that the
sented as reproducible appendicies
record contains all the required ma-
to the manual and are to be filled out
as the procedures are completed.
terial and that the associated pro-
These sheets shall always accom-
cedures contained all the proper
references to the assembly/test
pany assembly and test procedures
record. An example of a record is
and may accompany maintenance
provided as Figure 3-13. In some
and handling procedures where
instant es, the record may be best
deemed necessary. The check-off
utilized if divided into portions cor-
sheets shall cover all critic al and
responding to the equipment's main
major steps in the procedures.
Notes should also be reiterated. All
assembly units.
entries on the check-off sheets shall
3.4.2.5.4.3 Associated Logs and
be called for in the accompanying pro-
Records. In complex weapon sys-
cedures. It is the responsibility
tems, other records and/or logs may
of the cognizant writer to determine
require entries during various pro-
that the check-off sheet contains all
cedures. For example, a test set
the required material and that the
operating time may be required in
procedures contain all the proper ref-
the test set log. In these cases,
erences to these check-off sheets.
such entries shall be called for in
An example of a check-off sheet is
the appropriate procedures.
provided as Figure 3-12. The check-
off sheets may be better utilized if
4. QUALITY
ASSURANCE
divided corresponding to the equip-
PROVISIONS
ment's main assembly units.
3.4.2.5.4.2 Assembly/Test Record. 4.1 All requirements outlined in
Section 4 of MIL-M-81273A shall be
The assembly/test record provides
followed. In addition, the provisions
a compilation of such information as
assembly numbers, component mark, of on-site review (4.3.2) shall be met.
mod, and serial numbers, operational
5. PREPARATION FOR DELIVERY
settings, and other significant data.
The record is normally presented as
5.1 All requirements outlined in
a reproducible appendix to the manual
and is to be filled out as the assembly
Section 5 of MIL-M-81273A shall be
followed.
and test procedures are completed.
12
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business