MIL-DTL-87929D
APPENDIX I
I.3.5.7.7 Servicing. Servicing instructions shall be provided and shall include lubrication, adjustment and
any other servicing requirements as applicable.
I.3.5.7.8 Disassembly. Detailed disassembly instructions shall be provided. These procedures shall
conigure the item for packaging.
I.3.5.7.9 Component Repair. This paragraph shall state the repair limitations for the munitions and shall
identify those maintenance tasks which can be performed on assembled munitions. These instructions shall
include all procedures authorized for accomplishment at the level of maintenance determined by the acquiring
activity and shall include those expanded step-by-step procedures for corrective actions in the Classiication
of Defect Tables. Torque requirements shall be included in textual form.
I.3.5.7.9.1 Removal/replacement. Detailed instructions for removal/replacement of items/components shall be
provided. It shall also include a statement that all replacement components shall be inspected in accordance
with applicable WP/SWP prior to assembly. Appropriate illustrations shall be included.
I.3.5.7.9.2 Component repair. Instructions shall be provided for the maintenance/repair of authorized
components. Appropriate illustrations shall be included.
I.3.5.7.10 Cleaning, corrosion control, painting, and marking.
I.3.5.7.10.1 Cleaning/corrosion control materials and procedures. Procedures for cleaning/corrosion control
shall be included. A reference to TO 1-1-691 for basic corrosion control procedures shall be provided. A
table shall be included and arranged in the following format:
Cleaning/Corrosion Control Materials and Procedures
Discrepancy
Material
Speciication/Part Number
Tools and Procedures
a. Discrepancy. The discrepancy to check for.
b. Material. The material(s) to be used.
c. Speciication/Part Number. The military, Government, or commercial speciication number or
part number shall be shown.
d. Tools and Procedures. The tools and procedures to correct the discrepancy.
I.3.5.7.10.2 Painting and markings. This paragraph shall provide a brief description of the purpose of
painting and marking requirements and call out the table which presents an approved materials list to
be used to accomplish the required task. A reference shall be made to WP 010 00 for the marking
requirements of the item and container. This paragraph shall also contain the following statement: "Apply
protective paints in accordance with TO 1-1-8." The table shall be arranged in the following format:
Paint
and
Marking
Materials
Item
Use
Speciication Number/Color
Number per FED-STD-595
a. Test. The component/item to be painted/marked.
b. Speciication Number/Color Number. The military, Government, or commercial speciication
number, and color per FED-STD-595.
c. Use. Identiies the use or purpose of the materials.
I.3.5.7.11 Maintenance SWPs. These SWPs shall include the information required by I.3.5.7, except
I.3.5.7.9.1 and I.3.5.7.9.2. SWPs shall be provided for sections, major components, training munitions or
differing conigurations, as applicable.
I.3.5.8 Illustrated Parts Breakdown WP (WP 998 00). An IPB work package shall be prepared and
numbered 998 00. The format and contents of the IPB WP shall be in accordance with MIL-PRF-38807.
All references to "Figure Number" shall be changed to "WP/SWP Number and Figure Number".
69
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business