MIL-DTL-87929D
APPENDIX I
a. Step-by-step procedures for installing items in container, in all standard storage and shipping
conigurations.
b. Preservation instructions.
c. Applicable container marking and sealing requirements.
I.3.5.6.3 Unpacking and Packaging SWPs. These SWPs shall include the information required by
I.3.5.6. An Unpacking and Packaging SWP shall be provided for sections, major components, training
munitions, or differing conigurations, as applicable.
I.3.5.7 Maintenance WP (WP 070 00). Procedures for authorized maintenance of the munitions shall be
included. A list of materials to be used shall be included. Consumable materials shall be in accordance with
I.3.2.g. Those required for cleaning, painting, and markings shall be listed only in WP 030 00 and in this
WP as speciied herein. Arrangement of the WP shall be in the following order, as applicable:
a. Safety Summary and Accident Prevention (see I.3.2.f.).
b. Sequence of Operations (see I.3.5.7.1).
c. Torque Requirements Table (see I.3.5.7.2).
d. Maintenance (see I.3.5.7.3).
e. Preparation for Use (see I.3.5.7.4).
f. Assembly (see I.3.5.7.5).
g. Checkout (see I.3.5.7.6).
h. Servicing (see I.3.5.7.7).
i. Disassembly (see I.3.5.7.8).
j. Component Repair (see I.3.5.7.9).
k. Cleaning, Corrosion Control, Painting, and Marking (see I.3.5.7.10).
I.3.5.7.1 Sequence of operations. When deviations are not authorized, the acquiring activity will provide
the appropriate sequence of work to be performed. Otherwise, this paragraph shall contain the following
statement: "Production techniques involving preparation of more than one item may require deviations
from the work sequence. Several procedures may be performed simultaneously, and in different work
areas, providing the preceding and subsequent tasks are not invalidated or interfered with and that all
safety and reliability requirements are observed."
I.3.5.7.2 Torque requirements table.
This table shall be arranged as follows and contain the appropriate
information in each column:
Torque
Requirements
Torque
Part Number
Nomenclature
I.3.5.7.3 Maintenance. Maintenance procedures described herein shall include all authorized maintenance
actions, including those required to respond to the defects noted as a result of inspections conducted in
accordance with WP 050 00 and/or tests conducted in accordance with WP 080 00.
I.3.5.7.4 Preparation for use. These instructions shall include all procedures for preparing an item for use,
such as inspection of components, assembly (buildup), installation of components, alignment, test, and
complete inspection, as applicable. When preparation for use/assembly results in change of identiication or
DoD Ammunition Code (DODAC), procedures shall be included to ensure all applicable functions are notiied.
I.3.5.7.5 Assembly.
Detailed assembly instructions shall be provided. Appropriate illustrations shall
be included.
I.3.5.7.6 Checkout.
Checkout instructions for assembled items shall be provided.
68