I.3.5.8.1 Illustrated Parts Breakdown SWPs. These SWPs shall include the information required by I.3.5.8.
SWPs shall be provided for sections, major components, training munitions or differing conigurations, and
numbered accordingly, as applicable.
I.3.5.8.2 Separate manual. When speciied, the IPB shall be developed as a separate manual. When the
IPB is provided as a separate manual it shall be prepared in accordance with MIL-PRF-38807 (see I.6.2).
I.3.5.9 Testing/Reprogramming WP (WP 080 00).
When speciied, this WP shall be included (see I.6.1).
This WP shall contain the following information.
I.3.5.9.1 Testing and reprogramming procedures. This WP shall include instructions and step-by-step
procedures using speciied equipment for electrical, mechanical, and functional testing of munition items
and/or reprogramming. Electrical continuity/resistance checks shall include, as applicable, meter preparation
procedures, protective shielding, electrical grounding, and tie-down requirements. When applicable, reference
to appropriate SWPs for specialized testing shall be included.
I.3.5.9.2 Records/documentation. When required for the weapon system, procedures shall be included
to record and report test/reprogramming records and documentation.
I.3.5.9.3 Test evaluation. This paragraph shall follow test requirements and the title of the paragraph shall
be "Test Evaluation". Criteria and procedures shall be provided for evaluation of tests conducted. This
paragraph shall also present the disposition instructions for items that have been rejected. This paragraph
shall also contain a reference to AFI 21-202 for the disposition of nonrepairable items.
I.3.5.10 Contingency Procedures WP (WP 090 00). When speciied, this WP shall be included and shall
contain the following information as required (see I.6.2):
I.3.5.10.1 Concept of operations. Information shall be included which describes the concept of operations,
e.g. an explanation of rapid assembly during contingency operations.
I.3.5.10.2 Breakout and preparation for use. If required by the acquiring activity, this information shall
provide the minimum instructions required to prepare assembled munitions for use during contingency
operations.
I.3.5.10.3 Unpacking, inspection, and assembly. If required by the acquiring activity, this information shall
provide the minimum instructions required to unpack, inspect, and assemble munitions for contingency
operations.
I.3.5.11 Depot Related Data and Special Instructions WP (WP 100 00). When speciied, this WP shall be
included (see I.6.2). The acquiring activity will provide the appropriate data for storage requirements and
detailed procedures for disassembly, repair, assembly, and inspection/testing of applicable components.
I.3.5.12 Additional WPs (WP 110 00 through 997 00). When speciied, additional WPs (e.g. maintenance
for unique support equipment, unique testers, etc.) are required (see I.6.2), the acquiring activity will specify
the type of WP and the information to be included.
I.3.6 Chemical Munitions/Biological Research Agents manual. When speciied, CMBR agents manuals shall
be prepared in accordance with MIL-DTL-87929 and this appendix (see I.6.2).
I.3.6.1 Safety Summary and Accident Prevention WP (WP 020 00).
See I.3.5.2.
I.3.6.1.1 Decontamination. These instructions shall include step-by-step procedures for decontamination of
the CMBR agents, when this information is included in general or other technical manuals, such manuals
shall be referenced. If the agent or decontamination solution is classiied, the procedures shall be included in
a separate supplement. When included, these procedures shall be arranged in the following order:
a. Description (see I.3.6.1.1.1).
b. Symptoms (see I.3.6.1.1.2).
c. First Aid (see I.3.6.1.1.3).
d. Decontamination of personnel (see I.3.6.1.1.4).
e. Decontamination of clothing (see I.3.6.1.1.5).
f. Decontamination of equipment (see I.3.6.1.1.6).
70
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business