MIL-PRF-63045B (TM)
3.3.9.3 Section III - Pre-operational specifications and self-test procedure. This section shall include
information as to required pre-operational specifications applicable to checks and procedures done on the test
equipment before actual testing is performed on the unit under test (UUT). If applicable, instructions on any
adapter required for UUT procedures shall be included. Instructions shall be provided in this section for
testing the performance of the test equipment in the event of failure of the UUT. Any necessary diagrams
shall be included in this section.
3.3.9.4 Section IV - Troubleshooting. This section shall provide troubleshooting procedures should the
test equipment fail to satisfy the requirements of the self-test procedure. An explanation as to how end item
and major components function, and how these components interface with the rest of the equipment, shall be
provided for the depot technician. Only essential information which the technician must know to troubleshoot
the test equipment properly shall be provided. When specified by the contracting activity (see 6.2), functional
block diagrams, test layouts, or schematics referred to and placed in appendix C (see 3.3.13) shall be used to
illustrate the interface between the test equipment and the unit or assembly equipment UUT testing loop.
3.3.9.5 Section V - Maintenance.
3.3.9.5.1 Disassembly. Disassembly procedures shall be provided to support troubleshooting, repair, or
inspection (riveted, soldered, and welded parts are not normally mentioned in disassembly). Illustrations shall
be used to support the procedures. When specified by the contracting activity (see 6.2), engineering drawings
shall be referenced for disassembly procedures.
3.3.9.5.2 Repair, replace, and adjust. Instructions and specifications for repair, replacement, or
adjustment shall be provided in the sequence by which they are performed. Test equipment setup and other
illustrations necessary to support the procedures, with a list of all mandatory replacement parts, shall be
provided.
3.3.9.5.3 Assembly. Step-by-step instructions for assembly shall be provided, including in-process and
final inspection requirements, if applicable. When specified by the contracting activity (see 6.2), the
instructions shall be supported by illustrations and a checklist. When specified by the contracting activity
(see 6.2), engineering drawings shall be referenced for assembly procedures.
3.3.10 Chapter 5 - Calibration. When previously developed calibration procedures are available, the
publications containing the procedures shall be referenced. If no calibration procedures have been developed,
they shall be prepared according to the general technical requirements of MIL-M-38793 and the standard
format provided by the contracting activity (see 6.2). The calibration procedures developed shall appear in
this chapter. When specified by the contracting activity (see 6.2), engineering source data shall be used
verbatim.
3.3.11 Appendix A - Reference. This appendix shall consist of a consolidated listing of all reference
material (such as documents, forms, drawings, etc.) in the text and/or necessary for operation and
maintenance of the test equipment. The documents shall be listed alphabetically or numerically under each
type heading.
7
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business