MIL-DTL-38804D
3.5.2.6 Date of issuance. The
preparing activity shall use the Issue Date, provided by the acquiring activity
(see 6.2j.) on an AFMC Form
873 (see 6.6). The preparing activity shall place the TCTO Issue Date in the
upper right corner of the irst
(title) page/screen, immediately below and lush left with the Data Code
number. The year, month, and
3.5.2.7 Indicator of Safety marking. When speciied by the acquiring activity (see 6.2k.) on the AFTO
Form 873 (see 6.6) as approved by the designated authority (Coniguration Control Board [CCB], Item
Manager [IM], System Program Manager [SPM], or Engine Manager [EM]), the preparing activity shall use
the Indicator of Safety marking. This marking does not relect the priority designation but is used by the
Air Force for scheduling purposes. The Indicator of Safety marking "SAFETY TIME COMPLIANCE
TECHNICAL ORDER" shall be displayed in red immediately above the technical order title (see Figure 5).
3.5.2.8 Title or subject of instructions. The preparing activity shall use the TCTO title provided by the
acquiring activity (see 6.2n.) using the AFTO Form 873 (see 6.6). The title shall identify the item being
modiied or inspected, part number, model number, affected component of the item being modiied, and
part number of the applicable system/equipment. When applicable, the facility or site and associated
training equipment to which it pertains shall be included. The title shall be narrative style which clearly
indicates the nature of the TCTO, e.g., inspection, modiication, retroit change, etc. (see Figure 1 through
Figure 6). See TO 00-5-15 for additional guidance.
3.5.2.8.1 Contract End Item Number. The preparing activity shall use the Contract End Item Number from
the AFTO Form 873 (see 6.6). When a Contract End Item Number has been assigned to a particular
piece of equipment, the Contract End Item Number shall be included, in parentheses, immediately
preceding the noun description of the equipment.
3.5.2.9 Notes. Notes shall be inserted immediately below the title of each TCTO, when necessary, to
specify replacing, supplementing or personnel attention action. The following notes are typical but may be
3.5.2.9.1 Existing publications notes. One or more of the following notes and variations, as approved by
the acquiring activity (see 6.2o.), shall be used to replace, supplement, or formalize existing publications,
including ITCTOs (for TCTO Supplement note see 3.6.6.):
a. Electronic presentation: "This technical order replaces TO ____ , data code ____, dated
____. Information in the text changed or added in this issue is indicated by a [indicate
change markings used for electronic presentation]; changes to illustrations and diagrams are
indicated by shading or a pointing hand."
b. Print presentation: "This technical order replaces TO ____ , data code ____, dated ____.
Information in the text changed or added in this issue is indicated by a vertical line in
the outer margins of affected pages; changes to illustrations and diagrams are indicated by
shading or a pointing hand."
c. "This technical order formalizes interim IMMEDIATE action TO ____ , data code ____, dated
____ . Remove from active iles."
d. "This technical order is issued for the purpose of reinstating and establishing a new rescission
date for rescinded TO ____, data code ____, dated ____ ."
3.5.2.9.2 Affected operational procedures. When the detailed instructions affect system or equipment
operational procedure that would require the attention of personnel who would normally not have an interest
in the particular series TCTO, a note shall be placed on the irst (title) page/screen below the title. This
note shall read "Commanders are responsible for bringing this technical order to the attention of all Air
Force personnel cleared for operation of the affected system."
3.5.2.9.3 Additional notes. The preparing activity shall use additional notes, as provided by the acquiring
activity, on a case-by-case basis. For example, when a TCTO modiies life support systems, personal, or
survival equipment, a note similar to the following shall be included: "All [operating/light] personnel, prior
to next [use/light], shall be made aware of the effect this TCTO has upon the operation of the equipment."
6
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business