MIL-DTL-9977L(USAF)
3.6.3.2 General. Under this primary paragraph, the following irst subordinate paragraphs shall be covered.
3.6.3.2.1 Scope. The scope shall be in accordance with 3.3.3.2.1.
3.6.3.2.2 SE. SE shall be in accordance with 3.3.3.2.2.
3.6.3.2.3 Speciic safety requirements. Speciic safety requirements shall be in accordance with 3.3.3.2.3.
3.6.3.3 Loading procedures. Under this primary paragraph, the following irst subordinate paragraphs
shall be covered.
3.6.3.3.1 Aircraft preparation. Aircraft preparation shall be in accordance with 3.3.3.3.1.
3.6.3.3.2 Munitions preparation. Munitions preparation shall be in accordance with 3.3.3.3.2. In addition,
this procedure shall include steps required to assemble and install authorized fuzes, prior to munitions
loading. Procedures shall be included to verify the safety of each fuzed munition.
3.6.3.3.3 Cartridge installation. Cartridge installation shall be in accordance with 3.3.3.3.3.
3.6.3.3.4 Loading. This paragraph shall include steps required to load the munition. All steps shall be
singular. Unless otherwise speciied by the acquiring activity, this procedure shall include steps to remove
fuze safety device(s) after munitions are loaded (see 6.2). These procedures shall also include steps to install
fuzes which are not authorized for preloading installation.
3.6.3.3.5 Cartridge installation. Cartridge installation shall be in accordance with 3.3.3.3.5.
3.6.3.3.6 Postloading inspection. This paragraph shall include steps required to ensure that required safety
devices are installed, bombs and fuzes are installed properly, and fuze safety devices have been removed or
installed as required. All steps shall be plural.
3.6.3.3.7 Delayed light or alert. Delayed light or alert procedures shall be in accordance with 3.3.3.3.7.
3.6.3.3.8 Immediately prior to launch. Immediately prior to launch shall be in accordance with 3.3.3.3.8.
3.6.3.4 Unloading procedures. Under this primary paragraph, the following irst subordinate paragraphs
shall be covered.
3.6.3.4.1 Saing. Saing shall be in accordance with 3.3.3.4.1.
3.6.3.4.2 Preunloading. Preunloading shall be in accordance with 3.3.3.4.2.
3.6.3.4.3 Unloading. Unloading procedures shall be in accordance with 3.3.3.4.3.
3.6.3.4.4 Fuze and sensor removal. This paragraph shall include steps required to safe and remove the
fuze or sensor from the nonnuclear munition. All steps shall be singular. The following "NOTE" shall
be placed immediately after the paragraph and preceding the steps:
NOTE
With local commander approval, the following fuzes may remain installed.
3.7 Integrated combat turnaround procedures manual. The contractor shall use the DTD in Appendix E, if
electronic delivery of this manual is required (see 6.2). In addition, for electronic presentation, scrollable
views shall be divided into sections. Capitalization and underscoring of chapter, section, and paragraph titles
shall be in accordance with the requirements of MIL-STD-38784 (This manual shall be arranged as follows:
a. Front matter.
b. Chapter 1 - Prepositioning and munition(s) preparation.
1. Scope.
2. General safety requirements.
3. Emergency procedures.
4. SE
5. Prepositioning/inspection.
6. Munition preparation.