MIL-DTL-9977L(USAF)
NOTE
TO SPM/SPO
List all SE, except common hand tools, required to load/unload munitions
on/off aircraft.
3.8.2.3.2 Speciic safety requirements. Speciic safety requirements shall be in accordance with 3.3.3.2.3.
3.8.2.3.3 Aircraft preparation. Aircraft preparation shall be in accordance with 3.3.3.3.1 for aircraft procedures
identiied by the acquiring activity (see 6.2). The "NOTE" heading shall be "NOTE TO SPM/SPO."
3.8.2.3.4 Munitions preparation. Munitions preparation shall be in accordance with 3.3.3.3.3.
3.8.2.3.5 Cartridge installation. Cartridge installation shall be in accordance with 3.3.3.3.3.
3.8.2.3.6 Loading. This paragraph shall include steps required to load the munition. All steps shall be
singular. Unless otherwise speciied by the acquiring activity, this procedure shall include steps to remove
fuze safety device(s) after munitions are loaded (see 6.2). These procedures shall also include steps to install
fuzes which are not authorized for preloading installation.
3.8.2.3.7 Cartridge installation. The following "NOTE" shall be included for aircraft procedures identiied
by the acquiring activity (see 6.2).
NOTE
TO SPM/SPO
Implement those procedures required for stray voltage checks at impulse
cartridge breeches and installation of impulse cartridges."
3.8.2.3.8 Postloading inspection. Postloading inspection shall be in accordance with 3.6.3.3.6. In addition,
the following "NOTE" shall be included for aircraft procedures identiied by the acquiring activity (see 6.2).
NOTE
TO SPM/SPO
Implement those procedures required for checking that all pertinent aircraft
steps have been accomplished.
3.8.2.3.9 Delayed light or alert. Delayed light or alert shall be in accordance with 3.3.3.3.7. In
addition, the following "NOTE" shall be included.
NOTE
TO SPM/SPO
Implement those procedures required to place the aircraft in approved
delayed light or alert status.
3.8.2.3.10 Immediately prior to launch. This paragraph shall include munitions peculiar steps required to
place the aircraft in a launch coniguration. All steps shall be plural. The following "NOTE" shall be
included for aircraft procedures identiied by the acquiring activity (see 6.2).
NOTE
TO SPM/SPO
Implement those procedures required for preparing the aircraft for launch.
3.8.2.4 Standard munitions unloading procedures. The standard data package unloading procedures shall
include the following information.
3.8.2.4.1 Saing. Saing shall be in accordance with 3.3.3.4.1. In addition, the following "NOTE"
shall be included.
17
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business